Practical government contracting resources

Limitations on Subcontracting: Plan Workshare Before You Bid

A teaming plan must support both delivery and the requirements that apply to the award. Identify the relevant rule, calculation base, subcontractor status, and monitoring period before deciding that a proposed split works.

Federal-first guidance. Practical decisions. Official sources.

By Sources checked

On this page

The starting point

What to know before you begin

Limitations on subcontracting cannot be reduced to a universal instruction to perform half the work yourself. Covered acquisitions, contract categories, permitted exclusions, similarly situated entities, and lower-tier work all affect the analysis. This guide provides a disciplined starting point.

  • Determine applicability before calculating a percentage.
  • Use the correct payment or cost base and identify any permitted exclusions.
  • Keep similarly situated status and actual lower-tier performance under review.

The examples illustrate planning under the cited federal rules and are not determinations for a particular award. Read the applicable solicitation clauses, SBA regulations, and agency deviations together.

01 / The practical guide

Identify what obligation applies to this acquisition

Begin with the acquisition type, set-aside or program, assigned NAICS code, value, contract or order structure, and the incorporated clause. Distinguish limitations on subcontracting from a subcontracting plan, a joint venture partner's performance requirement, and a buyer's evaluation of small business participation. These are different questions and can require separate records.

SBA's 13 CFR 125.6 defines the covered acquisitions and category-specific limitations. Its rules include services, supplies, general construction, special trades, mixed contracts, and compliance periods. Check the full current provision for the situation in front of you.[1]

02 / The practical guide

Use the relevant category and base

Starting points in 13 CFR 125.6, with additional rules and exceptions to verify
CategoryGeneral limit on payments to firms not similarly situatedPlanning issue
Services, except construction50 percentIdentify the applicable base and whether specific other direct cost exclusions are permitted.
Supplies50 percent, with materials excludedReview manufacturing and nonmanufacturer rules; do not use this row alone for reselling.
General construction85 percent, with materials excludedSeparate material costs and verify the classified scope.
Special trade contractors75 percent, with materials excludedUse the applicable category, not a general construction assumption.

Sources [1]

A workshare spreadsheet should identify its denominator in words. State whether the figure represents the amount paid by the government, the relevant portion of a mixed requirement, or another verified base. Label excluded costs and cite the reason. Do not subtract a convenient cost merely because doing so makes the result pass.

03 / The practical guide

Verify similarly situated status and actual performance

Under SBA's definition, a similarly situated entity must have the required corresponding small business program status and be small under the NAICS code assigned to its subcontract. The relevant status depends on the acquisition. Being a small business in a general sense does not settle every program-specific situation.[2]

Record which work that subcontractor performs with its own employees and which work it passes to another tier. The rule accounts for further subcontracting and changes in qualifying status. A statement that a partner is similarly situated does not eliminate the need to track what happens during performance.[1]

Evidence to collect for the planned split

Use this to organize your review. Checked items stay on this page until you leave or refresh.

04 / The practical guide

Work a simple service example before adding complexity

Illustrative allocation
ItemAssumed amountTreatment in this example
Relevant government payment base$200,000Denominator after applicability and exclusions are verified.
Payments directly to non-similarly situated firms$80,000Count toward the limit.
Further subcontracting by a similarly situated firm$10,000Count toward the limit under the stated assumption.
Total counted payments$90,000$90,000 divided by $200,000 equals 45 percent.

Under those assumptions, the planned counted amount is below the 50 percent limit. The result would change if the classification, payment base, status, or lower-tier work changed. A forecast also does not prove eventual compliance: actual performance and payments still need monitoring. Keep the assumptions alongside the calculation so a reviewer can challenge them.

05 / The practical guide

Build a reviewable workshare record

Editable worksheet

Workshare planning worksheet

This worksheet records inputs; it does not automatically determine applicability or certify compliance. Keep calculations and supporting evidence in your working pricing file.

Edit the fields, add rows, and download your copy as a CSV for Excel or Google Sheets. Your entries stay in this page while it is open; download before navigating away or refreshing.

Requirement / periodApplicable rule and clauseCategory / NAICSBase and exclusionsFirm / status evidenceCounted payment / lower-tier workOwner / unresolved questionRow actions

Tie the record to the staffing plan, subcontract quotes, pricing schedule, and management narrative. If the narrative assigns a deliverable to the prime but the price assumes a subcontractor performs it, resolve the mismatch. Review changes before the response is submitted and again when the awarded scope or delivery plan changes.

06 / The practical guide

Keep other requirements visible

A mentor-protege joint venture may need a separate partner-level performance calculation. Do not substitute a limitations-on-subcontracting result for that test. The current joint venture rule addresses the protege's substantive participation and its own workshare requirements.[3]

ContractIQ can help organize the pursuit, map responsibilities, and align the workshare assumptions with the proposal and pricing. GoNoGo can keep a federal pursuit on Hold while a material issue is resolved, with notes explaining the next decision. Neither a tool score nor a checked worksheet establishes legal eligibility.[5]

A few common questions

Questions that come up

Is the rule always that the prime must do 50 percent?

No. The acquisition, category, calculation base, permitted exclusions, and treatment of similarly situated entities matter. Start with the applicable rule instead of applying one percentage to every contract.[1]

Is any small business subcontractor similarly situated?

No. The relevant program status and the size standard for the subcontract's NAICS code must be considered. Verify the actual entity and the requirements of the acquisition.[2]

Is this the same as a small business subcontracting plan?

No. A subcontracting plan addresses a different obligation, including planned participation and related administration. An acquisition can require analysis of multiple small business provisions without those provisions becoming interchangeable.

When should we review the calculation?

When developing the team and price, before final commitment, and when scope, status, lower-tier work, or payments change. Confirm the applicable compliance period from the governing requirements.

Sources and further reading

These sources support the distinctions in this guide. For a particular pursuit, read the current solicitation, amendments, and applicable agency requirements. Practical checklists and examples are provided by ContractIQ.

  1. 1.
    13 CFR 125.6: Limitations on subcontracting

    Electronic Code of Federal Regulations

  2. 2.
    13 CFR 125.1: Government contracting definitions

    Electronic Code of Federal Regulations

  3. 3.
    13 CFR 125.8: Small business joint venture requirements

    Electronic Code of Federal Regulations

  4. 4.
  5. 5.

When you need a person

Make the team, workshare, and price fit together.

We can help your team identify the applicable questions, organize evidence, and turn the proposed division of work into a coherent capture and proposal plan.

Keep federal opportunity discovery and pursuit decisions with you, on your phone or at your desk.