The starting point
What to know before you begin
Use this guide to connect the technical scope, site information, workforce, subcontractors, bonds, and pricing assumptions for a government construction pursuit. A sound readiness decision should explain both how the work will be performed and what remains unresolved.
- Check bid gates and delivery conditions before investing in the full estimate.
- Carry site, wage, bonding, and subcontract assumptions into the price.
- Federal, federally assisted, and wholly state or local projects can have different requirements.
The checklist is for pursuit and proposal planning. Use the actual solicitation, drawings, specifications, wage documents, contract clauses, agency deviations, and applicable state or local requirements for the project.
01 / The practical guide
Check the conditions that determine whether you can bid
Identify the procurement method, bidder qualifications, registration, license requirements, mandatory site visit, questions deadline, bid security, response deadline, and submission method. Then check the intended performance period, key milestones, access conditions, and any limits on when work can occur.
A task may fall within your technical capability while the schedule, bonding, or geographic commitment does not. Record those distinctions before deciding to prime, seek a subcontract role, find a qualified partner, or hold the opportunity. If the package is incomplete, identify the missing document and follow the stated question process.
02 / The practical guide
Resolve bonding capacity early
Distinguish bid security from performance and payment protection, and check the required form, amount, surety, timing, and execution instructions. Federal construction bond provisions include requirements and exceptions; state and local projects may use different rules. Confirm the specific package rather than applying a remembered threshold to every project.[1]
Discuss the actual project with your surety or bond professional early enough to address questions. Include contract amount, scope, schedule, current backlog, and any unusual conditions. SBA's Surety Bond Guarantee program supports eligible small businesses through participating surety companies, but an individual business still needs the appropriate review and approval.[2]
| Item | What to confirm |
|---|---|
| Bid stage | Required security and whether the submission form is complete. |
| Award and start | Required performance and payment protection and when it must be delivered. |
| Capacity | Single-project and aggregate commitments relevant to the proposed award. |
| Cost | Applicable premiums and related costs included in the estimate. |
03 / The practical guide
Translate site conditions into labor and sequence
Review drawings, specifications, reports, access rules, phasing, occupied-area restrictions, utility interruptions, storage, staging, and working hours. During a permitted site visit, record observations and questions. Use the official clarification process for ambiguities; do not assume an informal conversation changes the solicitation.
Build the estimate around a realistic sequence. Evening work, limited shutdown windows, escort requirements, restricted deliveries, or separate mobilizations can change crew productivity and supervision. Align supplier lead times and subcontractor commitments with that sequence. Identify assumptions that depend on government-provided access or information.
04 / The practical guide
Use the applicable labor requirements in the estimate
Davis-Bacon and Related Acts requirements can apply to covered federal and federally assisted construction. Applicable wage determinations identify minimum wages and fringe benefits for relevant classifications. The funding source and project circumstances matter; a state or local owner does not by itself establish that federal labor requirements are absent.[3][4]
Locate the actual wage determination and version identified for the procurement. Match the planned work to appropriate classifications, examine fringe treatment, and resolve missing or uncertain classifications through the required process. Also review applicable overtime, payroll, apprenticeship, and other labor provisions with the people responsible for workforce compliance. Do not treat a generic hourly wage from a prior project as the complete labor cost.
05 / The practical guide
Reconcile subcontract quotes with the complete scope
Issue consistent scope information to suppliers and subcontractors. Ask each to identify inclusions, exclusions, schedule, validity, assumptions, and required inputs. Compare quotes on the work actually included. A lower number may omit testing, permits, disposal, protection, bonds, or other obligations that remain in the prime's scope.
Before final approval, compare the technical approach, schedule, estimate, price forms, subcontract assumptions, and exceptions. Resolve contradictions and confirm that the company can commit the resources and terms described.
06 / The practical guide
Make a deliberate bid decision and handoff
Record the delivery plan, major risks, assumptions that have been resolved, and conditions that remain. A useful go decision is more than confidence in the trade work; it identifies who will manage the complete obligation. Preserve the estimate basis and approved commitments for the project team if the work is awarded.
GoNoGo can help discover and organize federal construction opportunities and record the pursuit decision. ContractIQ can help evaluate the requirement, coordinate the response and pricing work, and review readiness with your team. SLED construction capture and proposal support can be scoped separately around the buyer's requirements.[6]
A few common questions
Questions that come up
Are all government construction projects bonded the same way?
No. Check the issuing buyer, governing requirements, amount, exceptions, and actual solicitation provisions. Bid security and post-award performance or payment protection are separate items.[1][2]
Can federal labor requirements apply to a local project?
They can apply to covered federally assisted construction. Examine the funding and applicable labor provisions, as well as relevant state and local requirements.[3]
Should we rely on the lowest subcontract quote?
Compare scope, exclusions, schedule, qualifications, and assumptions before comparing the totals. The prime still needs a complete delivery plan and price for the required work.
Can ContractIQ help if our team already prepared the estimate?
Yes. We can scope a review of requirements, assumptions, response alignment, or submission readiness, or work alongside your team on a broader capture and proposal effort.
Sources and further reading
These sources support the distinctions in this guide. For a particular pursuit, read the current solicitation, amendments, and applicable agency requirements. Practical checklists and examples are provided by ContractIQ.
- 1.FAR 28.102-1: Construction bonds and payment protection
Acquisition.gov
Check agency adoption, exceptions, and the actual bond provisions before pricing.
- 2.Surety bonds
U.S. Small Business Administration
- 3.Davis-Bacon and Related Acts
U.S. Department of Labor
- 4.Davis-Bacon wage determination questions
U.S. Department of Labor
- 5.Respond to a solicitation
U.S. General Services Administration
- 6.